Once choose the function that to perform and click on “Execute”
Note: UPS must supports those function to perform it
Test Control
UPS Self Test: Execute UPS Self Test
UPS Calibration Test: Execute UPS Calibration Test
Turn-Off Parameters
Turn-Off Delay: To set the buffering time for UPS before shutdown
Sleep Time: To set UPS sleep time.
Test Period
Unknown: This defined by UPS configuration.
Two weeks: Perform UPS test every two weeks
Weekly: Perform UPS test every week
Disable: Do not perform UPS test